Tommy Walsh's Eco House

Episodes

Season 1
No image
1. Introduction

October 3, 2007 · 25 min

The DIY guru attempts to build an affordable eco-friendly home in 60 days with a limited budget.

No image
2. Installing Rainwater-Harvesting Drainage System

October 10, 2007 · 25 min

The team installs the rainwater-harvesting drainage system, which supplies the toilets, washing machine and dishwasher.

No image
3. Block-And-Beam Floor Delay

October 17, 2007 · 25 min

With the block-and-beam floor nowhere to be seen, the team tries to come up with a solution to allow the bricklayers to begin their work.

No image
4. Damp-Proof Membrane & Thermal Blocks

October 24, 2007 · 25 min

To improve the house's energy efficiency, a damp-proof membrane is laid to prevent heat loss and thermal blocks are used instead of concrete increasing, the house's thermal efficiency.

No image
5. First-Floor Joists & Timber Frame Roof

October 31, 2007 · 25 min

The joists for the first floor are installed along with the timber frame that forms the basis of the roof. And the team try to eat doughnuts without licking their lips.

No image
6. Polyurethane Wall Insulation

November 7, 2007 · 25 min

Polyurethane wall insulation is added, and the team considers installing supportive wooden pegs called 'nogs'.

No image
7. Roof Slates & Solar Panels

November 14, 2007 · 25 min

The roof slates and solar panels are fitted to the house, and the team learns the property will be the most energy-efficient in the Fens.

No image
8. Exterior Cladding & Under-Floor Heating

November 21, 2007 · 25 min

The house starts to take shape as the exterior cladding is fitted and the under-floor heating is installed.

No image
9. Rooms Boarded & Special Water Tank

November 28, 2007 · 25 min

The rooms are boarded in preparation for plastering, and a special water tank becomes the latest environmentally friendly addition to the project.

No image
10. Completing The Project

December 5, 2007 · 25 min

With the deadline looming, there's still a lot to do. Tommy and the team work on the fitting the staircase, tiling, electrics and plumbing in a bid to complete the project.